Skip to content
Free email security check: see your domain's SPF, DKIM and DMARC score in 10 seconds
Xen Bilişim

Cloud migration

Google Cloud migration service

We plan and carry out your migration to Google Cloud from AWS, Azure, VMware, or your own servers. Inventory, architecture, and cost analysis are completed before migration begins.

Last updated: 18 September 2026

Engineer checking servers in a data center

How is migration to Google Cloud done?

Migration is done in four stages. First, an inventory of servers, applications, and databases and their dependencies is gathered. Then the target architecture and cost are designed. Workloads are migrated in groups, first to a test environment and then to production. In the final stage, cost and performance are optimized. A rollback plan is kept ready for each group.

Our migration method

  1. 01

    Discovery and inventory

    Servers, applications, databases, and the connections between them are gathered through automated tools and interviews.

  2. 02

    Business and cost analysis

    For each workload, a decision to rehost, replatform, rewrite, or retire, along with a Google Cloud cost estimate.

  3. 03

    Landing zone

    Networking, identity, permissions, logging, and budget structure are set up before migration begins.

  4. 04

    Pilot migration

    A non-critical workload is migrated, measured, and used to refine the process.

  5. 05

    Phased migration

    The remaining workloads are migrated in groups, outside business hours, with a rollback plan.

  6. 06

    Optimization and handover

    Sizing, committed-use discounts, monitoring, and documentation. Followed by managed support.

Where and how we migrate from

SourceTypical methodWhat to watch for
AWSVirtual servers to Compute Engine, containers to GKE/Cloud Run, databases to Cloud SQLData egress cost and differences in the IAM model
Microsoft AzureVirtual machines to Compute Engine, SQL databases to Cloud SQLEntra ID identity integration and Windows licenses
VMwareTo VMware Engine as-is, or converted to Compute EngineLicense renewal date and network design
On-premises physical serversVirtualized and migrated to Compute EngineHardware-dependent applications and license keys

Google programs that reduce migration cost

Google offers credits and assessment support that cover part of the cost for eligible migration projects (for example, the Rapid Migration and Modernization Program). We check during discovery whether your project qualifies for these programs.

SSS

Frequently asked questions

Do systems go down during migration?

For most workloads, downtime is reduced to a matter of minutes through data synchronization and is scheduled outside business hours. The downtime window for each workload is agreed in writing beforehand.

Is moving to the cloud always cheaper?

No. Servers that are migrated and left as-is sometimes end up more expensive. Savings come from correct sizing, committed-use discounts, and shutting down unnecessary systems. That is why we run a cost analysis before migration.

How much does data transfer cost when leaving AWS?

Egress fees vary with data volume. Some cloud providers have announced exemption programs for customers leaving the service entirely. We assess the current terms during the migration plan.

Related pages

The first step toward migration: a cost assessment

Share your current infrastructure and approximate monthly spending. We will work out the Google Cloud equivalent and the outline of a migration plan at no charge.